Campus · WAN · SD-WAN · OT
Network infrastructure
A production network is not a shopping list of access switches. ianAsher designs the fabric, the WAN, and the ugly edges (plants, yards, oil-field sites) so applications stay up through a cutover.
Campus · WAN · SD-WAN · OT
A production network is not a shopping list of access switches. ianAsher designs the fabric, the WAN, and the ugly edges (plants, yards, oil-field sites) so applications stay up through a cutover.
Campus and data-center switching on Cisco Catalyst / Nexus and Arista EOS — leaf/spine when the traffic asks for it, collapsed core when it does not.
WAN, VPN, and SD-WAN chosen for the path, not the slide: ISR/Catalyst 8000, partner SD-WAN, or honest site-to-site when that is the right answer.
Segmentation, QoS, and multicast only where the application actually needs them. OT and SCADA stay off the office VLAN.
Documentation is part of the job: as-builts, change windows, and a named engineer who will still pick up after go-live.
IDF/MDF cleanup, Catalyst or EOS access, uplinks and optics quoted with the switch — not as a surprise.
Branch, plant, and field locations with a WAN story that survives a fiber cut and a truck roll.
SCADA-adjacent networks, radios, and segmentation that keep pumps off the guest SSID.
Cross-connects and hybrid paths that make a Houston-area footprint feel like one environment.
Sample SKUs and sellable services in the categories that attach to this practice.
C9300-48P-A
48× 1G PoE+ access with Network Advantage. The closet switch we actually spec for Texas campuses.
C9200L-24T-4G
Fixed 24-port data access with 4× 1G uplinks. Quiet branch and IDF workhorse.
C9500-24Y4C
25G campus/core with 100G uplinks. Quote with optics — they are not a footnote.
ISR4331-V/K9
Branch router with voice licensing path. Still the right answer when SD-WAN is marketing, not a requirement.
C8200L-1N-4T
Edge routing / SD-WAN capable platform. Design session recommended before you buy the DNA/catalyst tax.
C9130AXI-B
Wi-Fi 6 internal-antenna AP for offices. Survey first; we will not sprinkle APs from a floor plan PDF.
Ready to scope this?
Design session or a written quote — same Montgomery bench.